Digital & ICT

Network System Installation

Install, terminate and test structured cabling and small business networks.

6 tasksNSQ Level 12h 39m of practice0 ready to start

What you’ll be able to do

Certify a link that passes on a tester.

  1. 01Plan a cable route and containmentSet the route, respect bend radius and separate from power. 15 minPlanned
  2. 02Terminate a patch panel and outletPunch down to the correct scheme and keep the twist. 16 minPlanned
  3. 03Test and certify a copper linkRun the test, read the result and correct any failure. 14 minPlanned
  4. 04Terminate and test fibrePrepare, splice and test a fibre run. 20 minPlanned
  5. 05Configure a small business switchSet the ports, VLANs and basic management access. 18 minPlanned
  6. 06Diagnose an intermittent link faultIsolate a fault that only appears under load. 16 minPlanned
At the end of the program

Practical assessment · Structured Cabling

Complete every task under assessment, then sit a supervised practical on a real rig at an approved centre. Pass it and the certificate goes on your record, verifiable by any employer.

Ready — you can practise it today In build — being written and reviewed now Planned — part of the program, not yet built