
Digital & ICT
Network System Installation
Install, terminate and test structured cabling and small business networks.
6 tasksNSQ Level 12h 39m of practice0 ready to start
What you’ll be able to do
Certify a link that passes on a tester.
- 01Plan a cable route and containmentSet the route, respect bend radius and separate from power. 15 minPlanned
- 02Terminate a patch panel and outletPunch down to the correct scheme and keep the twist. 16 minPlanned
- 03Test and certify a copper linkRun the test, read the result and correct any failure. 14 minPlanned
- 04Terminate and test fibrePrepare, splice and test a fibre run. 20 minPlanned
- 05Configure a small business switchSet the ports, VLANs and basic management access. 18 minPlanned
- 06Diagnose an intermittent link faultIsolate a fault that only appears under load. 16 minPlanned
At the end of the program
Practical assessment · Structured Cabling
Complete every task under assessment, then sit a supervised practical on a real rig at an approved centre. Pass it and the certificate goes on your record, verifiable by any employer.
Ready — you can practise it today In build — being written and reviewed now Planned — part of the program, not yet built