Construction
Floor Cladding, Tiling & Interlocking
Set out, lay and finish tiled and interlocking surfaces to line, level and fall.
6 tasksNSQ Level 12h 32m of practice0 ready to start
What you’ll be able to do
Lay a floor that is flat, square and drains where it should.
- 01Set out a floor from the centre lineEstablish the datum and dry-lay to balance the cut tiles. 14 minPlanned
- 02Lay a tiled floor to levelComb the adhesive, bed the tiles and keep the joints true. 18 minPlanned
- 03Tile a wall with a cut around fittingsMark, cut and fit tiles around a socket and a pipe. 16 minPlanned
- 04Grout, clean and seal a finished surfaceFill, tool and clean the joints without hazing the tiles. 12 minPlanned
- 05Lay interlocking paving to a fallSet the screed, lay the pattern and hold the drainage fall. 20 minPlanned
- 06Replace a cracked tile in a finished floorRemove and reinstate a single tile without damaging the neighbours. 12 minPlanned
At the end of the program
Practical assessment · Floor & Wall Tiling
Complete every task under assessment, then sit a supervised practical on a real rig at an approved centre. Pass it and the certificate goes on your record, verifiable by any employer.
Ready — you can practise it today In build — being written and reviewed now Planned — part of the program, not yet built